WIND AND SOLAR POWER
Services:
- Cabins and vacation homes
- Remote sites
- Off-the-grid
- Net user agreement installations
- Green buildings – for LEED and other green building programs
- Inverters
- Battery systems
- Hybrid systems
[tags: solar, wind, energy, power, clean, residential, commercial, net user agreement, green, power, rooftop, standalone, off-grid, off the grid, cabin, vacation home, LEED, photovoltaic, panels, renewable, sustainable, Utah, turbine, sails, windpump, generator, bladeless, vortex, windfarm, eco-friendly]
UNDERGROUND LOCATING
We do underground locates where Blue Stakes can’t; Blue Stakes will locate only for member services and generally only on the utility side. We offer utility, sewer, cable fault, metallic and some non-metallic locates. We can locate phone and power lines up to 20 feet in depth.
We also can locate faults in underground cabling including medium and high voltage cables, as well as high voltage cable thumping.
MEDIUM VOLTAGE
Services:
- 600 – 46,000 Volts
- Terminations
- Cable splice
- Overhead and underground
- Plant distribution
- Medium voltage motors including 2300 volts, 4160 volts
- High pot testing, VLF Testing
POWER LINE/POLE LINE CONSTRUCTION
Services:
- Plant distribution
- Mountain and remote sites
- Primary metered private lines
UNDERGROUND UTILITIES
Services:
- Plant distribution
- Medium voltage cabling
- High voltage cabling
- Manhole and utility vault construction
- Duct banks
- Telecommunication lines and conduits
- Horizontal Directional Drilling (HDD) or boring
COGENERATION
We have experience installing and commissioning generators such as: Waukesha, Caterpillar, solar turbine, Westinghouse turbine and GE turbine; using a variety of fuels – natural gas, diesel , sewage plant methane, oil refinery hydrogen – generating up to 167 mega watts.
SUBSTATIONS
We have experience and expertise in constructing, reworking and commissioning primary metered customer owed plant substations, power company substations, hydroelectric dam substations and power plant substations up to 500,000 volts; including excavation, concrete work, steel erection and welding.